The Dublin Port Tunnel

The Dublin Port Tunnel is the first project of itsand remove smoke if a fire did erupt. There is
kind in Ireland. While there is a tunnel in cork, Thealso a gradual lighting effect at the exits so that
Jack Lynch Tunnel, the Dublin Port Tunnel is on andrivers won't be blinded driving from dark to light.
entirely different scale. There is a budget for theAmong the criticisms for the tunnel is the fact
tunnel of 752 million euros, and it is estimated bythat it are that it is not high enough to take super
the completion date, over 7million man hours willtrucks, those which are higher than the normal
have been spent building the tunnel. The project iscontainer trucks. There is also criticism during the
one of the biggest being currently worked on inbuilding of the tunnel because of rising costs and
Europe.due to noise levels from the huge boring machines
The tunnel is aimed to bring heavy good vehicleswhich were working under many residential areas.
from the M50/M1 to the port, and remove themOther arguments against the tunnel include, more
from the roads in and around the city. There areroads lead to more traffic and there were less
two tunnels being constructed, one will take trafficexpensive options available to the government to
in to the port (south bound) while the other willlink the port with the M50.
take traffic out of the port (north bound). TheThe benefits that the tunnel will bring to Dublin
total distance of the tunnel is 5.7 kilometres and itaccording to Dublin City Council are the removal
is estimated that the journey will only take 6of HGV from the roads around Dublin, and the
minuets.knock on effects of better environments and
Safety is always a major concern on projects likebetter traffic movement, the reduced travel time
this, and the planners have been careful to includefor HGV travelling to and from the port and safer
a number of safety features such as pedestrianroads. The tunnel is expected to open during the
paths between the tunnels and emergencysummer of 2006, and only then will the benefits
phones every 250 meters. There are massivebe able to be truly measured.
fans which will improve the air quality in the tunnel